Three methods of construction waste disposal

Home page TOP

Due to the relatively concentrated construction waste, the site is relatively limited, and the traffic is not very convenient, it is recommended to choose mobile crushing station. Firstly, this construction waste crusher is a moving crushing and screening combination, which is used for multi-stage crushing of large and large pieces of materials. In addition to mobile station equipment covers an area of small broken equipment, flexible and convenient, strong maneuverability, can save a lot of infrastructure and relocation costs; to conduct on-site materials instead of crushing material transported from the scene and then broken, and with the raw material mining face advancing and moving, thereby greatly reducing the material transportation costs. Mobile crushing station configuration is flexible, can be based on the actual site design modification or particularity of mobile crushing station, very suitable for construction waste crushing.

The construction waste storage yard mainly uses the low-lying land or valley in the suburbs of cities and towns. After the condition is ripe, the construction waste can be utilized or transported to landfill disposal. Construction waste storage yard should be located in convenient transportation, close to the source of construction waste, and will not be planned in the near future, and the storage capacity can meet the requirements of temporary storage.

The construction waste landfill site can be centrally set up in cities and counties. The construction waste landfill site should be chosen in the low-lying Valley. The waste pit quarry, convenient transportation, reasonable distance, the value of land use, low groundwater poor areas; landfill capacity should ensure the service area of the damaged building garbage and reconstruction of the construction waste landfill capacity.

There are also renewable resources in construction waste, mainly including waste residue, waste brick and tile, waste concrete, waste wood, scrap steel, waste metal components and so on. The utilization of construction waste in disaster area should give priority to the nearby backfilling and simple and practical recycling methods. Then, the structure, the damage to protect the value of the ancient architecture and traditional dwellings maintenance components, especially the decorative component, according to the original process, the original function is applied to the reconstruction of the building to build the original position.

Leave a comment

Your email address will not be published. Required fields are marked *